Page 57 - Vol.13
P. 57
機
需求 需求
5D
ISO/PID
3D 2D
機
機
機
台
機
Tool layout Tool con guration
機台 機
機台
Hookup drawings layout Integration
參考文獻
[1] TSMC OI Document : Tool installation
sign-off O.I.(A-RMS-07-03-181).
[2] Vol.1 : 5D Fab (TSMC
5D Fab Development Retrospection).
[3] 5D http://crystal5d.com/
用
[4] Martin Fischer, June 2008,The
Journal of Information Technology
用 in Construction, BENEFITS
AND LES SONS LEARNED OF
IMPLEMENTING BUILDING VIRTUAL
案 DESIGN AND CONSTRUCTION (VDC)
TECHNOLOGIES FOR COORDINATION
OF MECHANICAL, ELECTRICAL, AND
PLUMBING (MEP) SYSTEMS ON A
LARGE HEALTHCARE PROJECT.
[5] C.C. Sullivan, Integrated BIM and
用 Design Review for Safer, Better
Buildings.
[6] Wei-Chih Wang, 2012, Application
of F ALCON and fmGA to cost
案
estimation for semiconductor hookup
construction.
NEW FAB ENGINEERING JOURNAL MARCH 2014 57