圖四、PCM 系統概念調整   資料來源:本文整理




                                   IVsion                                           IVsion
                        Communi-             Cost                        Communi-             Cost
                          cation           Management                      cation           Management



                     ESH                        Engineering           ESH                        Engineering
                   Management                     Form              Management                     Form
                                    PCM                                             PCM


                      Commis-                   Labor                  Commis-                   Labor
                      sioning                   Control                sioning                   Control

                              Quality  Schedule                                Quality  Schedule
                              Control   Control                                Control   Control









              使用者界面人性化等問題須再持續                  作流程串接起來,才能使 PCM 確
              改善外,另有兩個比較根本的專案                  實成為專案工作者每日工作不可或
              管理問題更須同步搭配處理。ㄧ為                  缺之工具幫手。將 PCM 由平台概
              工 作 分 解 結 構 (Work Breakdown      念強化為完整連結之系統(如 圖四
              Structure, WBS)、 成 本 分 解 結 構     所示)。
              (Cost Breakdown Structure, CBS)
              與 組 織 分 解 結 構 (Organizational
              Breakdown Structure, OBS)  等 尚
              未建構完備。專案工作須經過系統
              整理分析,展開成分解結構之對應
              矩陣,使工作可以依照層級分類進
              行模組化管理及績效分析。在外部
              軟體設計中,皆可發現多以此分解
              結構做為系統基礎,而後再進行各
              種變化應用,因此各模組容易進行
              資料交換與統整,也可減少資料
                                               參考文獻
              輸入之重工。這一部份目前已在
              PCM Schedule 模 組 建 立 Project     [1]  Project  Management  for  Construction:
                                                 Fundamental  Concepts  for  Owners,
              Appraisal Guide System-PAS 進 行     Engineers,  Architects  and  Builders  (by
              工作分解結構之蒐集與整理,而近                    Chris  Hendrickson,  Department  of  Civil
                                                 and Environmental Engineering, Carnegie
              期也配合專案發包時程,重新檢討
                                                 Mellon University, Pittsburgh)
              目前使用之成本分解結構,以期更
                                               [2]  Project  Management:  A  system  s
              符合專案現況與管理目標,同時須                    approach  to  planning,  scheduling  and
              規劃發展輸入界面以系統化蒐集成                    control  (by  Harold  kerzner,  PH.D.,  The
                                                 international  institute  for  learning  New
              本資料庫,以利未來與工作分解結                    York, 2009)
              構及組織分解結構矩陣對應成為                   [3]  Pr oject  and  C ost  E ng i neer s’
              PCM 底層架構。                          Handbook Fourth Edition (by Kenneth K.
                                                 Humphreys  Ph.D.,  Consulting  Engineer,
              而其二則是須再針對 PCM 相關的                  Granite Falls, North Carolina, U.S.A.)
              工作流程進行定義,目前 PCM 各                [4]  A  guide  to  the  Project  Management
                                                 Body  of  K nowledg e  (Pr oject
              模組間相關性較弱,須透過定義工
                                                 Management  Institute,  Pennsylvania,
              作流程,將各模組各自及相互的工                    U.S.A.)