Page 34 - Vol.06
P. 34

Special
             Report
             特別企劃




                                      As Is                                   To Be
                 Year-month   Jan-11  Feb-11  Mar-11  Apr-11  May-11  Jun-11  Jul-11  Aug-11  Sep-11  Oct-11  Nov-11  Dec-11

              CDA month cost (NT)  6,120,125  5,467,174  6,052,942  5,703,462  5,826,394  5,627,862   5,812,333    5,815,457  5,582,502  5,676,404 5,580,792  5,723,071
             Dryer running fee (NT/  203,112   183,456    203,112    196,560   203,112   196,560   203,112    203,112   196,560    162,490    157,248    162,490
                     M)
               P1P2 month wafer   7,462,320    6,138,020  6,433,957 5,972,220  6,759,147  7,038,900   6,184,996    4,951,196  5,454,330 6,239,804 5,419,230  5,838,850



                  moves  (pcs)
             P1P2 avg wafer moves
                   (pcs/day)  240,720    219,215   207,547    199,074   218,037   234,630    199,516   159,716    181,811   201,284   180,641   188,350
              CDA unit KPI (KWH/
                    CMH)       0.136    0.137   0.137   0.132    0.134   0.132    0.134   0.136    0.134   0.132    0.130   0.133
               sub-total cost (NT)  17,640,241           17,157,718          17,210,292          16,980,267

             2010 CDA running cost 72,408,017    NT/yr

               2011 CDA running cost  68,988,518  NT/yr
                 2012 Benefit  4,486,949    NT/yr                               ASC benefit   TL benefit

                                                                                 3,302,000     1,184,949    NT/yr
             表一、P1/2 ASC+TL minimum 實際運轉數值





             節能後再節能                                  4,100
             Running current                         4,000

             terminate limit (TL)
             adjustment                              3,900
                                                    kWH  3,800
                  察ASC可控制空壓機長期保
             觀    持 在 最 小 負 荷 後 ,適 度 調 整             3,700

             TL  (terminate  limit)  將馬達額定電
             流設定在95% (147 A to 140 A),               3,600
             使每台空壓機保持在最佳效率的運
                                                     3,500
             轉,同時也可再大幅下降運轉電                                Jan Feb Mar Apr May Jun  Jul  Aug Sep Oct Nov Dec
             流,根據2011年十月至十二月 ASC
                                                    圖八、F12 P1/2 ASC+TL minimum 四台空壓機實際運轉耗能曲線(KWH)
             加上TL節能的數據表現,如表一及
             圖八,可再為十二廠一、二期省下
             1,185  KNT/year  (-1.6%)的空壓機
             運轉電費成本,ROI  再下降成0.5
             年,P1/2總共i-ASC system 能夠省
                                                                                CDA 的單位用電比 (KWH/CMH)  ASC 安裝後
             下4,487 KNT /year (- 6.16%)。             0.16
                                                    KPI(KWH/CMH)  0.14
                                                     0.15
             i-ASC推廣至                                0.13

             十二廠三期之成效
                                                     0.12
                                                     0.11
             經    過 十 二 廠 一 、 二 期運 轉 測 試             0.1
                  後,已證實此i-ASC  系統確實
             可安全地使用並且達到節能功效,
             將此案推廣至十二廠三期使用後,
                                                    圖九、F12 P1/2/3 與各廠空壓機用電KPI 比較


            34
   29   30   31   32   33   34   35   36   37   38   39