             圖一、標單項目示意圖

               工程名稱 : F14P7 Office MEP Package               工程名稱 : F14P5 Office MEP Package

               項次   Pay Item or  Specification  Dimension  單位   項次   Pay Item or  Specification  Dimension  單位
               Item  Description (必填)              Unit      Item  Description (必填)                   Unit
               2.3  Transformer  含 變壓器, 箱體, 底座               2.4   Transfrmer with case
               2.3.1  XTR (北側屋外)  XTR 80kVA, 480V-208/120V      set  2.4.1                             set
               2.3.2  XTR (南側屋外)  XTR 100kVA, 480V-208/120V      set  2.4.2   Transfrmer with case   模鑄式 F級 100kva 480/208-120V       set
               2.3.3  XTR (FAC UPS)  XTR 120kVA, 480V-208/120V     set  2.4.3                          set
               2.3.4  XTR (HUB UPS)  XTR 160kVA, 480V-208/120V     set  2.4.4                          set
               2.3.5  XTR (廚房/插座)  XTR 200kVA, 480V-208/120V      set  2.4.5                           set
                                                   set
               2.3.6  XTR (南側插座)  XTR 250kVA, 480V-208/120V      無法比對  2.4.6                           set
               2.3.7  XTR (地下照明)  XTR 50kVA, 480V-380/220V      set  2.4.7  Transfrmer with case  乾式 F級 50kva 480/480-277V       set
               2.3.8  XTR (E電照明)  XTR 150kVA, 480V-380/220V      set  2.4.8   Transfrmer with case   模鑄式 F級 150kva 480/208-120V       set
               2.3.9  XTR (N電照明)  XTR 250kVA, 480V-380/220V      set  2.4.9                            set


               3.3  Drain System                             3.3  Drain System
               3.3.1  Pipe                                   3.3.1  Pipe                              m
                                                             3.3.2  Pipe     PVC SCH80         200A   m
               3.3.1.6  透氣管 PVC PIPE  PVC   150A   m         3.3.3  Pipe     PVC SCH80         150A   m
                                                             3.3.4  Pipe     PVC SCH80         125A   m
               3.3.1.7  透氣管 PVC PIPE  PVC   100A   m         3.3.5  Pipe     PVC SCH80         100A   m
               3.3.1.8  透氣管 PVC PIPE  PVC   80A    m         3.3.6  Pipe     PVC SCH80         80A    m
               3.3.1.9  透氣管 PVC PIPE  PVC   50A    m         3.3.7  Pipe     PVC SCH80         50A    m
               3.3.1.1  PVC PIPE   PVC B管   150A   m
               3.3.1.2  PVC PIPE   PVC B管   125A   m         3.3.8  Pipe(Vent)  PVC CLASS B    125A   m
               3.3.1.3  PVC PIPE   PVC B管   100A   m         3.3.9  Pipe(Vent)  PVC CLASS B    100A   m
               3.3.1.4  PVC PIPE   PVC B管   80A    m         3.3.10 Pipe(Vent)  PVC CLASS B    80A    m
               3.3.1.5  PVC PIPE   PVC B管   50A    m         3.3.11 Pipe(Vent)  PVC CLASS B    50A    m
               RP  PVC PIPE   PVC O管        125A   m         3.3.12 HVAC Drain System                 m
                   PVC PIPE   PVC O管        100A   m         3.3.13 Pipe     PVC SCH80         100A   m
                   PVC PIPE   PVC O管        75A    m
                                                             3.3.14 Pipe     PVC SCH80         50A    m
               RO  PVC PIPE   PVC O管        25A    m         3.3.15 Pipe     PVC SCH80         25A    m
               ACP  PVC PIPE   PVC O管       50A    m
                   PVC PIPE   PVC O管        25A    m



            成本管理模式                           出的設計方案進行工程材料、設備                 營運維護階段
                                             系統的選擇及單價審查的工作。此                 施工完成、驗收合格及正式啟用
                                             部份應配合及參照規劃階段所擬定                 後,為維持營運所需之維護成本。
            成本管理主要可分為五個階段:規                  之初步預算,以符合成本控制之目
            劃階段、設計階段、招標發包階段、                 的。
            施工階段及營運維護階段。
                                             招標發包階段
            規劃階段                             審查設計單位提送之設計預算,包                 發包階段之
            擬定工程專案整體初步預算,依據                  含設計數量、單價分析等。依據預                 成本管理
            專案設計需求,作為預算經費編                   算審查結果擬定發包底價。
            列、現金流量計畫等相關財務規
            劃。                               施工階段                            決定工程成本的因素很多,其中之
                                             施工進度、廠商估驗計價之審核及                 一,便是招標發包階段的發包結
            設計階段                             覆核,避免進度落後、成本超支,                 果。透過成本標竿管理的模式,分
            為達專案需求,針對設計單位所提                  或年度預算不足之情形。                     析及比對發包工程的數量及單價,