Figure 20、Preliminary Layout of SRP
Figure 21、 Project Milestones of SRP Scope
4.6 Solvent Thermal Recovery Plant(STRP) under 7kg/cm2G and 170°C steam condition. For steam user,
the steam conditions will be 5kg/cm2G and 159°C.
4.6.1 Plant Scope
Steam generation unit will consist with one Furnace
STRP will process about 24,000 tons/yr of waste solvent to burning spent solvent and natural gas, discharging flue
and generate about 91,200 tons/yr of low-pressure steam for gas and recovery the heat into steam by boiler. Four liquid
ZWM plants. The Table 7 demonstrates the four types of waste waste solvent streams shall be fired. Spent solvent shall be
solvent feed. sprayed into the furnace by the sprayer lance and make
4.6.2 Process Introduction decomposed completely due to the high temperature flue
gas. Furnace temperature is controlled to keep 1050℃ by the
Solvent Thermal Recovery Plant will constitute of one steam
fuel gas burner installed on the top of the incinerator. Then
generation unit, with the space reserved for the future expansion
combustion flue gas is introduced to the waste heat boiler. The
of two units. The unit capacity can generate 15 ton/hour steam
exhaust flue gas will be purifying by AQCS(air quality control